⚡ Energy & Power

Project AMPERE — Technopark Energy Platform

ACTIVE   Ukraine (technopark-anchored, phased 2027–2030)

Integrated energy platform: up to 100 MW gas cogeneration, 125 MW / 500 MWh storage, 60 MWp solar and 40 MW wind, anchored by a tax-advantaged industrial park. USD 392M program; USD 156M equity sought; base case 21.9% equity IRR, 3.5x MOIC.

Ukraine is short 9.5 GW of generation (Ukrenergo, Feb 2026) after losing about 26 GW since 2022; wholesale prices sit near regulatory caps and imports cannot close the gap. ITAL GLOBAL is developing an integrated platform that sells dispatchable peak power, storage flexibility and green energy into this shortage, anchored by a high-technology industrial park whose residents buy heat, power and services, and whose registered status carries a 10-year profit-tax exemption.

THE PLATFORM (PHASED 2027–2030) — 98.9 MW gas CHP (43 MWM TCG 3020 V20 engines, 87.6% total efficiency, heat to residents at 45% below boiler parity); 125 MW / 500 MWh BESS for evening-peak arbitrage plus 5-year Ukrenergo balancing contracts; 60 MWp solar + 40 MW wind with guarantees of origin; technopark with anchored demand, 10-year CIT exemption, VAT/customs relief and state infrastructure support.

PROJECTED FINANCIALS (MANAGEMENT ESTIMATES) — Steady state from 2031: USD 146M revenue, USD 65M EBITDA (44% margin). On a 12-year hold with 2037 exit at 6.5x EBITDA: 21.9% levered USD equity IRR and 3.5x MOIC base case (6.3% / 1.5x conservative; 31.6% / 5.7x optimistic). Distributions from 2028. Minimum DSCR 2.3x.

THE OFFER — Preferred equity in three milestone-gated tranches (USD 55M / 60M / 41M), alongside USD 196M DFI-led senior debt (DFC / EBRD / IFC / ECA-covered) and USD 40M sponsor equity. US feeder into BIT-jurisdiction HoldCo owning the Ukrainian project company; board seats, reserved matters, IFRS + Big Four audit; DFC and MIGA political-risk and war-risk insurance; ICSID arbitration. Exit window 2033–2037. Seeking one or two anchor investors for Tranche 1 (USD 55M).

STATUS — Project is at concept / pre-feasibility stage; there are no signed contracts, site control or permits as of August 2026. All projections are management estimates.

NEXT STEP — Download the teaser, investor deck, investment memorandum and energy model below, then apply for collaboration to sign an NDA and receive the confidential memorandum, 10-year financial model and data room.

Project documents

📄
Project AMPERE — Teaser (PDF)
Download
📄
Project AMPERE — Investor Deck (PDF)
Download
📄
Project AMPERE — Technopark Investment Memorandum (PDF)
Download
📄
Project AMPERE — Technopark Energy Model (Excel)
Download

Apply for Collaboration on this project →